AccountingLink for Sage 300 CRE - Batch Post Error - Bills
The following items should be reviewed if a Bill can not be posted to Sage 300 CRE.
Step 1: Relink Sage Construction Management and Sage 300 CRE Vendor
- Open AccountingLink
- Click Contact Management tab
- Click Manually Link Vendor link
- Relink Sage Construction Management Vendor referenced on Bill with Sage 300 CRE Vendor
Step 2: Run Batch Post Wizard and try posting Bill again
- Click Batch Post Wizard in the Post tab
- Post Bill to see if an error occurs.
IF ERROR:
Step 3: Review Post Preferences
- Click Post Preferences link at top.
- Click the Resources and Dimensions tab and review the following properties.
- Cost Resource Type Mapping: All Sage Construction Management resources (M, L, E, S, O) should be linked to a Sage 300 CRE resource.
- Cost Code Mapping | Logic and default cost code.
Tip: Review how job cost codes referenced on the Sage Construction Management Bill correlate to Sage 300 CRE Cost Codes based on the Cost Code Logic property.
- Click the Accounts Payable (AP) Tab and review the following properties.
- Default Post Transaction Object
- Sage Construction Management Bills
- Sage Construction Management Bills from POs
- Sage Construction Management Bills not from POs (These are Bills entered manually in Sage Construction Management and thus not tied to a PO.)
- If Enabled: Post Rules based on Bill Type
- AP Payment Terms Linking | All Sage Construction Management payment terms should be linked to a Sage 300 CRE term.
- Default Post Transaction Object
- Be sure to Save if any changes are made.
- Run Batch Post Wizard again to post Bill.