Unlink a Subcontract
Important things to know
Posted Subcontracts can be unlinked in case a PO has been manually linked to the wrong project or if significant changes need to be made to the transaction, which should be then re-posted to Sage Intacct. This also requires deleting the original transaction in Sage Intacct to prevent duplicates.
Instructions
- Select Accounting Link > Accounts Payable (AP).
- Click View Subcontracts - Posted in the Sage CM Subcontracts section.
- Select the checkbox for the PO to be unlinked.
- Click Unlink Selected Subcontracts.The following warning message appears in the Accounting Status section of transactions that have been unlinked:
Warning: Transaction has been unlinked so be sure to delete the corresponding record in the accounting system prior to reposting to avoid any duplicates.