Lead Stages

The following are recommended stages for lead status and analysis.

Stage Description Final Stage
Received RFP / Bid Invitation
Reviewing Plans
Preparing Bid/Proposal
Submitted Bid
Not Bidding Yes
Not Awarded Yes
Awarded Yes

View and Add Lead Stages

  1. Log in to Sage Construction Management as an Admin.
  2. Click Settings (Gear Icon).
  3. Click Feature Settings | Leads and Projects.
  4. Navigate to the Lead Stages section.
  5. To add a Stage option, click the Add button above the grid.
  6. Navigate to the grid footer and enter the Stage Index Order and Description. If it is a final stage (ex. Awarded or Lost) be sure to check the Final Stage field.
  7. Click the Save button below the grid.

Note: A Lead Stage can not be deleted if it is referenced in a Lead.