Import Equipment Items Into Contract Admin, Procurement, or Work Order Transactions
Prerequisite For Importing Equipment Items
- With exception for Anticipated Costs, the "Target" Contract Admin, Procurement, or Work Order transaction must be saved.
- Job Cost Codes must exist for the project.
Import Data Entry Steps
- Click the 'Add / Import Items' from the drop-down as follows:
- Anticipated Costs: See Actions drop-down on Procurement Landing Page or at the top right of Anticipated Costs listing.
- RFP Packages: See drop-down above the Bidders list.
- Contract Admin | Procurement | Work Order Transactions: See drop-down above Items grid.
- Click 'Import Equipment Items' option in the drop-down. This will refresh the page.
- Select the rate to be imported. Options are shown below.
- Hourly Bill Rate
- Hourly Cost Rate
- Daily Bill Rate (eg. Hourly Bill Rate x 8)
- Daily Cost Rate
- Project Specific Hourly Bill Rate
- Project Specific Hourly Cost Rate
- Project Specific Daily Bill Rate
- Project Specific Daily Cost Rate
- Rental Daily Rate
- Rental Weekly Rate
- Rental Monthly Rate
- Optional: Enter text in the search field to filter the listing.
- Select the Equipment Item(s) in the list by clicking the checkbox.
- Enter either hours, days, weeks or months depending on the selected rate above.
- Optional: Select a Cost Code for each item being imported. If left blank, the default will be used.
- Select the default Job Cost Code below the grid. This is required when importing.
- Click the 'Add' or 'Add and Close' button.