Data views and standard log reports for drawings

  1. Go to Reports.

  2. In the Report Category dropdown, for projects select Project Specific Reports and for leads select Lead Specific Reports.

  3. Select Drawings from the Report Sub-Category dropdown.

  4. For project reports, select either Single Project Reports or Multi-Project Reports and select one or more relevant projects.

  5. For leads, select the Lead from the dropdown

  6. Select the appropriate report in the Standard Reports tab.

Alternatively, on the Project or Lead Home page, select Drawings in the Project Library section and select Reports on the Drawings page.