Manage the allowance package item options
Open the allowance package item details
-
Go to Projects and select the appropriate project from the list.
-
On the Project page, select Allowance Packages in the Client Contract Admincategory of the Project Menu section.
-
Select the allowance package number from the list.
-
In the Allowance Items section, select the item number or description.
Add allowance package item options manually
- In the Selection Options section, select Add / Import Items > Add Manually.
- In the Options section, enter the following information for each item:
- Optionally, update the Option #.
- Enter a Description.
- Optionally, enter the Manufacturer, Catalog #, UPC, and Product URL.
- Enter the Sell Rate, which is the customer's rate.
- Optionally, update the internal Cost Rate.
- Select the Resource, that is M, L, E, S, or O.
- To add more options, select Add New Line and repeat step 2.
- Select Save & Close.
Import work items
-
In the Selection Options section, select Add / Import Items > Import Work Items.
- In the Filter Information section, do the following:
- Select Text Search or a classification system from the Filter Type dropdown.
If you selected a classification system, select the lookup icon (
) next to the Filter field to select a classification code to filter the results. Otherwise, enter text in the field.- Select one of the following Rates To Import:
- Total Cost Rate
- Total Sell Rate
For example, the proposal rate.
- M Cost Rate
- M Sell Rate
- L Base Cost Rate
- L Cost Rate
For example, the base rate plus the burden cost rate.
- L Sell Rate
- E Base Cost Rate
- E Cost Rate
For example, the base rate plus the burden cost rate.
- E Sell Rate
- S Cost Rate
- S Sell Rate
- O Cost Rate
- O Sell Rate
- Select Filter.
- Select the checkbox next to each work item that you want to import.
- For each selected item, enter the Quantity.
- Optionally, select a Cost Code for each item being imported.
-
Select the Default Cost Code to use when an imported item does not have one specified.
- Select Add or Add & Close.
- Select Save & Close.
Edit multiple allowance package item options
- In the Selection Options section, select Edit List.
- Update the information for each item as needed.
- Select Save.
- Select Save & Close.
Edit individual allowance package item options
- In the Selection Options section, select the option description from the list.
- Update the information for the item as needed.
- Select Save & Close.