Crews overview
Crews are made up of Labor and Equipment Items and can be added to an estimate in which it will act similar to a Work Assembly.
Before you begin
-
Ensure that all labor items referenced in the crew have been set up and that their cost and bill rates are defined.
-
Ensure that all equipment items referenced in the crew are set up in the system and have defined hourly run-time rates.
- Optionally, set up the classification codes, such as cost codes, to group or filter crews.