What's new in Sage Construction Management

On this page, you can scan release highlights to get a quick understanding of what's new and review a list of all improvements organized by component.

The following enhancements are included in the June 2026 release.

Browser solution

Module Feature Feature description Go there
General browser Other You can now create accounts for partners and consultants in Sage Construction Management using the new CPA/ Sage Partner login licenses. New CPA/Sage Partner licenses for external users
You can now navigate more easily with a reorganized and categorized left side bar menu. Redesigned left navigation menu
Various browser improvements. Other browser enhancements
Contact management Other The Content Management landing page has been redesigned to provide easier and faster access to company, contact, and employee records.

Contact Management landing page enhancements

Cost Database Other The Cost Database landing page has been redesigned to provide easier and faster access to equipment, labor item, work item, crew, work assembly, and formula records.

Cost Database landing page enhancements

Projects and leads Drawings Review and manage drawing information more easily with an updated, structured layout. Updated drawing detail page
You can now filter drawings in card view using drawing set and discipline. New filter options in drawings card view
You can now use drawing sets to group and manage drawings more effectively when working with large sets of drawings. Drawing sets can be selected directly from the drawings Simple Listing. Drawing sets for organizing drawings
You can now organize and review drawings more efficiently using new grouping options and integrated revision details. Grouping enhancements in drawings simple listing
Drawing Set and Discipline columns have been added to the Link Existing File to Current Record grid when Drawing Log is selected as the source, providing additional drawing information to help users identify the correct file more quickly. Drawing Set and Discipline columns in Link Existing File to Current Record
You can now assign drawings to a drawing set during the upload process when creating a new project or lead. This helps ensure that drawings are organized and categorized correctly from the moment they’re added. Drawing set enhancements for new projects and leads
A new bulk action for drawings allows you to update the prime contract number for multiple drawings in a single action. Update the prime contract number for multiple drawings
Correspondence When importing respondents into a request for information (RFI) or submittal, you can now add an existing or new company directly to the project or lead directory from the form. Add companies and contacts to the directory from RFIs and Submittals
Linked files Documents now open in the new document viewer by default. New document viewer is now the default
You can now switch between the new and legacy document viewers from a document or drawing. Switch between document viewers
To improve the accuracy and efficiency of drawing measurements, the option to enable snapping for measurement tools is now enabled by default in the document viewer. Measurement tools snapping enabled by default
The document viewer toolbar has been simplified by hiding the option to create annotations when annotations are not available to provide a more consistent experience across viewer modes. Improved Document Viewer experience
Other  You can now see when a project or lead was last viewed and sort the list using this date on the Projects and Leads pages. View and sort projects and leads by last viewed date
Leads Other The Leads landing page has been redesigned to provide faster access to key insights and lead management tools. Leads landing page enhancements
Projects Documentation You can now filter photos by their modified date to quickly locate recently updated items. In addition, the photo details dialog displays the Created Date and Modified Date as read-only fields, enhancing visibility and auditability. Photos enhancements
Procurement Enhancements to purchase order (PO) workflows improve visibility into original and change order quantities across PO pages and the PO To Bill Wizard. Updates also streamline purchase order change order (PO CO) creation and improve rate import options for better cost accuracy. Purchase order enhancements
Time and expenses Employees and equipment added during crew clock-in are no longer assigned as crew members. After they clock out, they become available for use by other crews. Crew clock in and out enhancements
Multiple You can use the Reset Tax Code based on JCC bulk action to update tax codes for multiple prime contract or subcontract original items based on their assigned cost codes. Reset tax codes for multiple prime contract or subcontract original items
The Order Number field is now labeled Sort Order in the add and edit forms for multiple project transactions to better reflect its purpose. Order number field renamed
Other The Projects landing page has been redesigned to provide faster access to key insights and project management tools. Projects landing page enhancements

TeamLink Portal

Feature description Go there

Filter and review drawings more easily in TeamLink with additional options and improved display.

Enhancements to drawings in TeamLink
When viewing a document or drawing in TeamLink, you can now easily switch between the old and new document viewer. Switch between the old and new document viewer in TeamLink

AccountingLink for Sage Intacct

Feature description Go there
You can now automatically synchronize information for clients, employees, and vendors, and import project timesheets from Sage Intacct.

Automatic synchronization of addresses and project timesheets

Cost types are now correctly transferred when posting time entries to Sage Intacct. Improved syncing of cost types with time entries
The Project Manager and Sales Contact field values entered in Sage Intacct are now automatically populated when creating jobs through the AccountingLink for Sage Intacct. Automatically populate Project Manager and Sales Contact from Sage Intacct
You can now ensure records are valid before posting with enhanced validation and error messages. Improved validation for posting transactions

AccountingLink for Sage 300 Construction and Real Estate

Feature description Go there
You can now ensure records are valid before posting to Sage 300 Construction and Real Estate with enhanced validation and error feedback.

Improved validation for Sage 300 Construction and Real Estate posting

AccountingLink for Sage 100 Contractor

Feature description Go there
Transactions in Sage Construction Management are now validated before posting to Sage 100 Contractor, allowing you to identify and resolve validation issues before reprocessing.

Transaction validation before posting toSage 100 Contractor